Emergency Call
.

Transfer of unused Booked Delivery Transmission Capacity by way of public offer by the User DEPA (par. 5iii, article 20Α of the NGTS Code)

Posted on June 7, 2021

DEPA S.A. holds an open procedure for transferring Booked Delivery Transmission Capacity: 

in the Entry Point Kipi of: 

5,000,000 kWh/Day for the Days 11.06.2021 until 17.06.2021 

in the Entry Point Sidirokastro of: 

6,000,000 kWh/Day for the Day 13.06.2021 

according to the provisions of par. 5iii, article 20Α of the Network Code. Price: 0 Euro/MWh. Further information in the webpage www.depa.gr