Emergency Call
.

Transfer of unused Booked Delivery Transmission Capacity by way of public offer by the User DEPA (par. 5iii, article 20Α of the NGTS Code)

Posted on May 8, 2020

DEPA S.A. holds an open procedure for transferring Booked Delivery Transmission Capacity:

in the Entry Point ‘Kipi’ of:

2,482,000 kWh/Day for the Days 17.05.2020 till 19.05.2020 and 21.05.2020 till 27.05.2020

1,263,000 kWh/Day for the Day 20.05.2020

and in the Entry Point ‘Sidirokastro’ of:

6,267,000 kWh /Day for the Day 17.05.2020,

according to the provisions of par. 5iii, article 20Α of the Network Code. Price: 0 Euro/MWh. Further information in the webpage www.depa.gr