Hellenic Gas Transmission System Operator S.A.
Εmergency Call
Εmergency Call
8001122222(+30) 2105551666
210 5551666
  • ΕΛ
  • EN
  • THE COMPANY
  • CORPORATE SOCIAL RESPONSIBILITY
  • PRESS CENTER
  • CONTACT
  • ΗΛΕΚΤΡΟΝΙΚΗ ΦΟΡΜΑ ΥΠΟΒΟΛΗΣ ΓΝΩΣΤΟΠΟΙΗΣΗΣ
  • ΕΛ
  • EN
search
  • NATIONAL NATURAL GAS SYSTEM
    • National Natural Gas Transmission System
    • LNG Facility
    • Development of the NNGS
      • NNGS Development Study
      • NNGS Development Plan
      • European union list of projects of common interest
    • NNGS Operation Reports
    • Security of Supply
      • Emergency Plan
      • Registry of Interruptible Natural Gas Consumers
      • Training
      • Supply Security Levy
  • REGULATORY FRAMEWORK / COMPLIANCE
    • Union Regulatory Framework
    • Greek Regulatory Framework
      • Laws and Presidential Decrees
      • Ministerial Decisions
      • Decisions of RAE
    • Compliance
      • Code of Ethics
      • GDPR
      • Anticorruption Policy
      • Whistleblowing Policy
  • PROJECTS
    • New projects under constructions
    • New Connections
    • Facilities
    • Incremental Capacity
    • Technical Job Specification List
      • Pipelines
        • Piping – Welding- Vessels
        • Civil
        • Piping
        • Electrical – Cathodic & Lightning Protection
        • Instrumentation
        • Insulation
        • Miscellaneous
      • LNG Installation
  • REGULATED SERVICES
    • Transmission Services
      • NNGTS Access Guide
      • Transmission Users Information
        • Relevant Points and Capacities (Technical/Booked/Available)
          • Methodology of Capacities
          • Files of Capacities
        • Additional Transportation Capacity
        • Historical Data of Transmission System Operation
          • Historical Data of Natural Gas Quality
          • Hourly Quality Data of Interconnection Points
          • Historical Data of Gross Calorific Value
          • Historical Data of Natural Gas Deliveries / Off – Takes
          • Secondary Market of Natural Gas Transmission System
          • Historical Data of Natural Gas Pressure in Entry Points
          • Historical Data of N.G. Nominations/Allocations
        • Linepack Calculation
        • NNGTS Maintenance/Calibration Program
        • Natural Gas Quality Specification
        • NG Market Data
          • Virtual Trading Point
          • Market Shares Data
          • Yearly NNGS Data
      • Capacity Auctions
      • Standard Agreement & Other Documents
      • Transmission Tariffs
        • Charges Calculator
        • Guarantees Calculator
      • Market Test
        • Active
        • Non Active
      • New Connections
        • Active Publications
        • Non Active Publications
      • NNGTS Operational Gas
        • NNGTS Operational Gas Injection
        • Operational Gas Unit Charge
        • Operational Gas Offsetting Cost
      • Annex I of Regulation 715/2009
      • Commission Regulation (EU) 2017/460
    • LNG Services
      • LNG Access Guide
      • LNG Users Information
        • LNG Re – gasification Capacity
        • LNG Cargoes Unloading Program
        • Additional LNG Storage Space
        • Historical Data of LNG Operation
        • Total LNG Stock
        • LNG Quality Specifications
        • LNG Facilities Maintenance Program
        • Annual LNG Auctions
      • Standard Agreement & Other Documents
      • LNG Tariffs
        • Calculator of LNG Charges
        • Guarantees Calculator
      • LNG Terminal Operational Needs / LNG Facility Losses (2010-2020)
      • LNG Terminal Technical Data
      • LNG Terminal Offsetting Account Cost
      • LNG Transparency Template
    • Truck Loading Service
      • Regulatory framework
      • Framework Agreement
      • TLS Tariffs
      • TLS Timeslots
      • Technical Data for LNG Truck Loading Facility Usage
    • Balancing Services
      • Annual Planning of Gas Balancing
      • Balancing Costs
      • Unaccounted For Gas(UFG)
      • Daily Inbalance Settlement Prices
    • Access to EIS
    • Transparency
      • REMIT Reporting
      • UMM
        • Active Messages
        • Archive
  • OTHER SERVICES
    • Supplementary Transmission Services
    • Network Operation & Maintenance
    • Technical Support
    • Metrology
    • Pipeline Protection
    • LNG
    • CNG
    • Odorization
    • Welder Certification
    • Carbon Footprint
    • EU ETS Management
    • Seminars
    • Our Clients
    • Our e-brochure
  • SAFETY / ENVIRONMENT / QUALITY
    • Safety
      • Campaigns
      • Trainings - Collaborations
    • Environment
      • Carbon Footprint
    • Quality
  • ANNOUNCEMENTS
    • NNGS Users Information
    • Public Consultations
    • Procurement Procedures
  • THE COMPANY
    • Our Vision
    • Ιστορικό
    • Shareholders
    • Subsidiaries
    • Company Organization / Organizational Structure
      • Managing Team
    • Legislative Framework of Tendering Procedures
    • Financial Reports
    • Membership in International Institutions
  • CORPORATE SOCIAL RESPONSIBILITY
    • Sustainability Policy
  • PRESS CENTER
    • Press Releases
    • Corporate Brochures
    • Building Up the Greek Hydrogen Value Chain
  • CONTACT
  • ΗΛΕΚΤΡΟΝΙΚΗ ΦΟΡΜΑ ΥΠΟΒΟΛΗΣ ΓΝΩΣΤΟΠΟΙΗΣΗΣ
REGULATORY SERVICES
  • ΗΟΜΕ
  • REGULATED SERVICES
  • TRANSMISSION SERVICES
  • TRANSMISSION USERS INFORMATION
  • ADDITIONAL TRANSPORTATION CAPACITY
A-AA+
  • Transmission Services
    • NNGTS Access Guide
    • Transmission Users Information
      • Relevant Points and Capacities (Technical/Booked/Available)
      • Additional Transportation Capacity
      • Historical Data of Transmission System Operation
      • Linepack Calculation
      • NNGTS Maintenance/Calibration Program
      • Natural Gas Quality Specification
      • NG Market Data
    • Capacity Auctions
    • Standard Agreement & Other Documents
    • Transmission Tariffs
    • Market Test
    • New Connections
    • NNGTS Operational Gas
    • Annex I of Regulation 715/2009
    • Commission Regulation (EU) 2017/460
  • LNG Services
  • Truck Loading Service
  • Balancing Services
  • Access to EIS
  • Transparency

Additional Transportation Capacity

  • 2023

    October 2023

    Nea Mesimvria Entry Point………………..2.668.413 kWh/Day

    Sidirokastron Entry Point…………………...6.018.126 kWh/Day

    Sidirokastron Exit Point…………………...3.328.800 kWh/Day 

    September 2023

    Nea Mesimvria Entry Point………………..2.668.413 kWh/Day

    Kipi Entry Point…………….......………….2.429.615 kWh/Day

    Sidirokastron Entry Point…………………...5.874.664 kWh/Day

    Sidirokastron Exit Point…………………...3.314.265 kWh/Day 

    August 2023

    Nea Mesimvria Entry Point………………..2.668.413 kWh/Day

    Kipi Entry Point…………….......………….2.429.615 kWh/Day

    Sidirokastron Entry Point…………………...5.874.664 kWh/Day

    Sidirokastron Exit Point…………………...3.314.265 kWh/Day 

    July 2023

    Nea Mesimvria Entry Point………………..2.668.413 kWh/Day

    Kipi Entry Point…………….......………….2.429.615 kWh/Day

    Sidirokastron Entry Point…………………...5.874.664 kWh/Day

    Sidirokastron Exit Point…………………...3.314.265 kWh/Day 

    June 2023

    Nea Mesimvria Entry Point………………..2.668.413 kWh/Day

    Kipi Entry Point…………….......………….2.429.615 kWh/Day

    Sidirokastron Entry Point…………………...12.958.444 kWh/Day

    Sidirokastron Exit Point…………………...3.314.265 kWh/Day 

    May 2023

    Nea Mesimvria Entry Point………………..2.668.413 kWh/Day

    Kipi Entry Point…………….......………….2.429.615 kWh/Day

    Sidirokastron Entry Point…………………...7.068.242 kWh/Day

    Sidirokastron Exit Point…………………...3.314.265 kWh/Day 

    April 2023 

    Nea Mesimvria Entry Point………………..0 kWh/Day/ 2.668.413 kWh/Day from 20.04.2023

    Kipi Entry Point…………….......………….0 kWh/Day/ 2.429.615 kWh/Day from 20.04.2023

    Sidirokastron Entry Point…………………...3.534.121 kWh/Day/ 5.874.664 kWh/Day from 20.04.2023

    Sidirokastron Exit Point…………………...0 kWh/Day/ 3.314.265 kWh/Day from 20.04.2023

    March 2023

    Kipi Entry Point……………………….0 kWh/Day
    Sidirokastron Entry Point…………………...2.345.308  kWh/Day

    February 2023

    Kipi Entry Point……………………….0 kWh/Day
    Sidirokastron Entry Point…………………...1.172.654  kWh/Day

    January 2023

    Kipi Entry Point……………………….0 kWh/Day
    Sidirokastron Entry Point…………………...0 kWh/Day

  • 2022

    December 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….4.690.616 kWh/Day

    Report Additional Transportation Capacity for Delivery – December 2022

    November 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….5.945.379 kWh/Day

    Report Additional Transportation Capacity for Delivery – November 2022

    October 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….1.135.946  kWh/Day

    Report Additional Transportation Capacity for Delivery – October 2022

    September 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….6.913.732  kWh/Day

    Report Additional Transportation Capacity for Delivery – September 2022

    August 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….1.152.289  kWh/Day

    Report Additional Transportation Capacity for Delivery – August 2022

    July 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….6.129.000  kWh/Day

    Report Additional Transportation Capacity for Delivery – July 2022

    June 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….9.413.702  kWh/Day

    Report Additional Transportation Capacity for Delivery – June 2022

    May 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….3.534.121  kWh/Day

    Report Additional Transportation Capacity for Delivery – May 2022

    April 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….3.534.121  kWh/Day

    Report Additional Transportation Capacity for Delivery – April 2022

    March 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0   kWh/Day

    Report Additional Transportation Capacity for Delivery – March 2022

    February 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0   kWh/Day

    Report Additional Transportation Capacity for Delivery – February 2022

    January 2022

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0   kWh/Day

    Report Additional Transportation Capacity for Delivery – January 2022

  • 2021

    December 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – December2021

    November 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………. 1.103.551    kWh/Day

    Report Additional Transportation Capacity for Delivery – November 2021

    October 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………. 1.103.551    kWh/Day

    Report Additional Transportation Capacity for Delivery – October 2021

    September 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………. 0    kWh/Day

    Report Additional Transportation Capacity for Delivery – September 2021

    August 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………. 2.220.401    kWh/Day

    Report Additional Transportation Capacity for Delivery – August 2021

    July 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………. 6.661.204    kWh/Day

    Report Additional Transportation Capacity for Delivery – July 2021

    June 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………. 2.214.893    kWh/Day

    Report Additional Transportation Capacity for Delivery – June 2021

    May 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………. 1.107.446    kWh/Day

    Report Additional Transportation Capacity for Delivery – May 2021

    April 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….1.107.446   kWh/Day

    Report Additional Transportation Capacity for Delivery – April 2021

    March 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….2.216.301   kWh/Day

    Report Additional Transportation Capacity for Delivery – March 2021

    February 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0   kWh/Day

    Report Additional Transportation Capacity for Delivery – February 2021

    January 2021

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0   kWh/Day

    Report Additional Transportation Capacity for Delivery – January 2021

  • 2020

    December 2020

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0   kWh/Day

    Report Additional Transportation Capacity for Delivery – December 2020

    November 2020

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….1.103.551   kWh/Day

    Report Additional Transportation Capacity for Delivery – November 2020

    October 2020

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0  kWh/Day

    Report Additional Transportation Capacity for Delivery – October 2020

    September 2020

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….1.110.201  kWh/Day

    Report Additional Transportation Capacity for Delivery – September 2020

    August 2020

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point……………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – August 2020

    July 2020

    Kipi Entry Point…………………………0   kWh/Day
    Sidirokastron Entry Point………………..2.225.679   kWh/Day

    Report Additional Transportation Capacity for Delivery – July 2020

    June 2020

    Kipi Entry Point…………………………0   kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – June 2020

    May 2020

    Kipi Entry Point…………………………0   kWh/Day
    Sidirokastron Entry Point………………..1.107.446  kWh/Day

    Report Additional Transportation Capacity for Delivery – May 2020

    April 2020

    Kipi Entry Point…………………………0   kWh/Day
    Sidirokastron Entry Point………………..1.107.446  kWh/Day

    Report Additional Transportation Capacity for Delivery – April 2020  

    March 2020

    Kipi Entry Point…………………………520.000   kWh/Day
    Sidirokastron Entry Point………………..2.216.301  kWh/Day

    Report Additional Transportation Capacity for Delivery – March 2020  

    February 2020

    Kipi Entry Point…………………………260.000  kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – February 2020  

    January 2020

    Kipi Entry Point…………………………0  kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – January 2020  

  • 2019

    December 2019

    Kipi Entry Point…………………………0  kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – December 2019  

    November 2019

    Kipi Entry Point…………………………259.324  kWh/Day
    Sidirokastron Entry Point………………..1.103.151  kWh/Day

    Report Additional Transportation Capacity for Delivery – November 2019  

    October 2019

    Kipi Entry Point…………………………259.324  kWh/Day
    Sidirokastron Entry Point………………..2.206.328   kWh/Day

    Report Additional Transportation Capacity for Delivery – October 2019  

    September 2019

    Kipi Entry Point…………………………0  kWh/Day
    Sidirokastron Entry Point………………..0   kWh/Day

    Report Additional Transportation Capacity for Delivery – September 2019  

    August 2019

    Kipi Entry Point…………………………0  kWh/Day
    Sidirokastron Entry Point………………..0   kWh/Day

    Report Additional Transportation Capacity for Delivery – August 2019  

    July 2019

    Kipi Entry Point…………………………259.324  kWh/Day
    Sidirokastron Entry Point………………..2.225.679   kWh/Day

    Report Additional Transportation Capacity for Delivery – June 2019  

    June 2019

    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – June 2019  

    May 2019

    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………..1.107.446  kWh/Day

    Report Additional Transportation Capacity for Delivery – May 2019  

    April 2019
    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………..1.107.446   kWh/Day

    Report Additional Transportation Capacity for Delivery – April 2019  

    March 2019
    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………..2.216.301  kWh/Day

    Report Additional Transportation Capacity for Delivery – March 2019  

    February 2019
    Kipi Entry Point…………………………260.000 kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – February 2019  

    January 2019
    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – January 2019  

  • 2018

    December 2018
    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – December 2018  

    November 2018
    Kipi Entry Point…………………………259.324  kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – November 2018  

    October 2018
    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – October 2018  

    September 2018
    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – September 2018  

    August 2018
    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………..0  kWh/Day

    Report Additional Transportation Capacity for Delivery – August 2018  

    July 2018
    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………..2.225.678  kWh/Day

    Report Additional Transportation Capacity for Delivery – July 2018  

    June 2018
    Kipi Entry Point…………………………0 kWh/Day
    Sidirokastron Entry Point………………..0 kWh/Day

    Report Additional Transportation Capacity for Delivery – June 2018

    May 2018

    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………….1.108.036 kWh/Day

    Report Additional Transportation Capacity for Delivery – May 2018

    April 2018
    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………….20.371.879 kWh/Day

    Report Additional Transportation Capacity for Delivery – April 2018

    March 2018
    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………….27.877.308 kWh/Day

    Report Additional Transportation Capacity for Delivery – March 2018

    February 2018
    Kipi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – February 2018

    January 2018
    Kipi Entry Point………………………………0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – January 2018

  • 2017

    December 2017
    Kipoi Entry Point………………………………0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – December 2017

    November 2017
    Kipoi Entry Point…………………………………..259.324 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – November 2017

    October 2017
    Kipoi Entry Point…………………………………….0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – October 2017

    September 2017
    Kipoi Entry Point…………………………………….0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – September 2017

    August 2017
    Kipoi Entry Point………………………………….0 kWh/Day
    Sidirokastron Entry Point…………………………..8.577.633 kWh/Day

    Report Additional Transportation Capacity for Delivery – August 2017

    July 2017
    Kipoi Entry Point………………………………….0 kWh/Day
    Sidirokastron Entry Point…………………………..5.361.021 kWh/Day

    Report Additional Transportation Capacity for Delivery – July 2017

    June 2017
    Kipoi Entry Point………………………………….0 MWh/Day
    Sidirokastron Entry Point…………………………..0 MWh/Day

    Report Additional Transportation Capacity for Delivery – June 2017

    May 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..25.800,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – May 2017

    April 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..27.950,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – April 2017

    March 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..20.425,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – March 2017

    February 2017
    Kipoi Entry Point………………………………….0,000 MWh/Day
    Sidirokastron Entry Point…………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – February 2017

    January 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – January 2017

  • 2016

    December 2016
    Kipoi Entry Point………………………………….0,000 MWh/Day
    Sidirokastron Entry Point…………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – December 2016

    November 2016
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point……………………….4.300,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – November 2016

    October 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – October 2016

    September 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – September 2016

    August 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – August 2016

    July 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – July 2016

    June 2016
    Kipoi Entry Point…………………………………..390,000 MWh/Day
    Sidirokastron Entry Point……………………….10.800,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – June 2016

    May 2016
    Kipoi Entry Point…………………………………..5.980,000 MWh/Day
    Sidirokastron Entry Point……………………….48.600,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – May 2016

    April 2016
    Kipoi Entry Point……………………………………390,000 MWh/Day
    Sidirokastron Entry Point……………………….38.700,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – April 2016

    March 2016
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point……………………….24.840,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – March 2016

    February 2016
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – February 2016

    January 2016
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – January 2016

  • 2015

    December 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point………………………0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – December 2015

    November 2015
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point……………………20.520,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – November 2015

    October 2015
    Kipoi Entry Point………………………………..390,000 MWh/Day
    Sidirokastron Entry Point……………………3.780,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – October 2015

    September 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point…………………………0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – September 2015

    August 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point………………………7.020,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – August 2015

    July 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point………………………9.180,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – July 2015

    June 2015
    Kipoi Entry Point………………………………..390,000 MWh/Day
    Sidirokastron Entry Point………………………10.800,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – June 2015

    May 2015
    Kipoi Entry Point………………………………..910,000 MWh/Day
    Sidirokastron Entry Point………………………0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – May 2015

    April 2015
    Kipoi Entry Point………………………………..390,000 MWh/Day
    Sidirokastron Entry Point………………………38.700,360 MWh/Day

    Report Additional Transportation Capacity for Delivery – April 2015

    March 2015
    Kipoi Entry Point………………………………..390,015 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – March 2015

    February 2015
    Kipoi Entry Point………………………………..390,015 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – February 2015

    January 2015
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – January 2015

  • 2014

    December 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – December 2014

    November 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point……………………1.080 MWh/Day

    Report Additional Transportation Capacity for Delivery- November 2014

    October 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point……………………9.720 MWh/Day

    Report Additional Transportation Capacity for Delivery- October 2014

    September 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point…………………..1.081 MWh/Day

    August 2014
    Kipoi Entry Point……………………………… 390 MWh/Day
    Sidirokastron Entry Point………………….6.480 MWh/Day

    July 2014
    Kipoi Entry Point……………………………….390 MWh/Day
    Sidirokastron Entry Point………………….7.560 MWh/Day

    June 2014
    Kipoi Entry Point……………………………….390 MWh/Day
    Sidirokastron Entry Point………………..10.800 MWh/Day

    May 2014
    Kipoi Entry Point……………………………..910 MWh/Day
    Sidirokastron Entry Point………………..6.540 MWh/Day

    April 2014
    Kipoi Entry Point……………………………..390 MWh/Day
    Sidirokastron Entry Point………………17.440 MWh/Day

    March 2014
    Kipoi Entry Point…………………………….520 MWh/Day
    Sidirokastron Entry Point…………………….0 MWh/Day

    February 2014
    Kipoi Entry Point………………………………0 MWh/Day
    Sidirokastron Entry Point……………………0 MWh/Day

Hellenic Gas Transmission System Operator S.A.
Site Map
  • NATIONAL NATURAL GAS SYSTEM
    • REGULATORY FRAMEWORK / COMPLIANCE
      • PROJECTS
        • REGULATED SERVICES
          • OTHER SERVICES
            • SAFETY / ENVIRONMENT / QUALITY
              • ANNOUNCEMENTS

                ACCESS
                • Electronic Informatin System ESFA and Online Trading System N.G.
                Contact
                • DESFA Head Office
                • 357 -359 Mesogeion Av.
                • 152 31 Chalandri
                • Tel: +30 213 0884000
                • Fax: +30 210 6749504
                • Email: desfa@desfa.gr
                Εmergency Call
                Εmergency Call
                8001122222 (+30) 2105551666
                Links
                • Ministry Of Environment & Energy
                • RAE (Regulating Authority for Energy) in Greece
                • EDA Attica
                • EDATHESS Gas Distribution Company Thessaloniki - Thessalia SA
                • DEDA
                • ADMIE
                • LAGIE
                • ENTSOG
                • Gas Naturally
                • GIE
                • IGU
                Social Media

                © copyright DESFA 2018

                Top