The Operator provides to the Users LNG Services (access to the LNG facility located on the Island of Revithoussa at the gulf of Megara), in the most cost effective, transparent and direct manner, without discriminations among the Users and the User categories
The LNG Services include:
A) The LNG Cargoes Unloading including the mooring of an LNG vessel, the Discharge of LNG Cargo and the detachment of the LNG Vessel.
B) The provision, to the LNG User, of storage space in the LNG Facility for the interim storage of the LNG Cargo (Temporary LNG Storage).
C) The re-gasification of the LNG Cargo and its subsequent discharge into the Transmission System via the LNG Entry Point.
D) The execution of the necessary measurements as well as any action necessary for the effective, secure and cost effective operation of the LNG Facility, in the framework of the provision of the services stated above.
For the provision of the LNG Services, the Users shall enter into an LNG Agreement with the Operator.
Those LNG Agreements are based on the Standard LNG Agreement, where the contracting procedure, the contents as well as the terms for accessing and use the Revythoussa LNG facility are specified.
The LNG Agreement is entered between the Operator and entities registered in the NNGS Users Registry, for a contract period that consists of integral multiples of one (1) Day and at least for the time period between the Maximum Commencement Date of an LNG Agreement and the Minimum Expiry Date of an LNG Agreement, both of which are included therein, as long as:
A) They have (the LNG Users) booked Transmission Capacity at the LNG Entry Point of the Transmission System, as Transmission Users.
B) They serve other Transmission Users that have booked Transmission Capacity at the LNG Entry Point of the Transmission System.
In order to enter into an LNG Agreement, the Users submit to the Operator an Application for the provision of the Basic LNG Service, forty five (45) Days, before the beginning of the Month in which applicant’s first LNG Cargo is scheduled for Unloading, at the latest, as per the provisions of the Standard LNG Agreement. The application is followed by the documents and data defined as per the provisions of the Standard LNG Agreement.