Hellenic Gas Transmission System Operator S.A.
Εmergency Call
Εmergency Call
8001122222(+30) 2105551666
210 5551666
  • ΕΛ
  • EN
  • THE COMPANY
  • CORPORATE SOCIAL RESPONSIBILITY
  • PRESS CENTER
  • CONTACT
  • ΗΛΕΚΤΡΟΝΙΚΗ ΦΟΡΜΑ ΥΠΟΒΟΛΗΣ ΓΝΩΣΤΟΠΟΙΗΣΗΣ
  • ΕΛ
  • EN
search
  • NATIONAL NATURAL GAS SYSTEM
    • National Natural Gas Transmission System
    • LNG Facility
    • Development of the NNGS
      • NNGS Development Study
      • NNGS Development Plan
      • European union list of projects of common interest
    • NNGS Operation Reports
    • Security of Supply
      • Emergency Plan
      • Registry of Interruptible Natural Gas Consumers
      • Training
      • Supply Security Levy
  • REGULATORY FRAMEWORK / COMPLIANCE
    • Union Regulatory Framework
    • Greek Regulatory Framework
      • Laws and Presidential Decrees
      • Ministerial Decisions
      • Decisions of RAE
    • Compliance
      • Code of Ethics
      • GDPR
      • Anticorruption Policy
      • Whistleblowing Policy
  • PROJECTS
    • New projects under constructions
    • New Connections
    • Facilities
    • Incremental Capacity
    • Technical Job Specification List
      • Pipelines
        • Piping – Welding- Vessels
        • Civil
        • Piping
        • Electrical – Cathodic & Lightning Protection
        • Instrumentation
        • Insulation
        • Miscellaneous
      • LNG Installation
  • REGULATED SERVICES
    • Transmission Services
      • NNGTS Access Guide
      • Transmission Users Information
        • Relevant Points and Capacities (Technical/Booked/Available)
          • Methodology of Capacities
          • Files of Capacities
        • Additional Transportation Capacity
        • Historical Data of Transmission System Operation
          • Historical Data of Natural Gas Quality
          • Hourly Quality Data of Interconnection Points
          • Historical Data of Gross Calorific Value
          • Historical Data of Natural Gas Deliveries / Off – Takes
          • Secondary Market of Natural Gas Transmission System
          • Historical Data of Natural Gas Pressure in Entry Points
          • Historical Data of N.G. Nominations/Allocations
        • Linepack Calculation
        • NNGTS Maintenance/Calibration Program
        • Natural Gas Quality Specification
        • NG Market Data
          • Virtual Trading Point
          • Market Shares Data
          • Yearly NNGS Data
      • Capacity Auctions
      • Standard Agreement & Other Documents
      • Transmission Tariffs
        • Charges Calculator
        • Guarantees Calculator
      • Market Test
        • Active
        • Non Active
      • New Connections
        • Active Publications
        • Non Active Publications
      • NNGTS Operational Gas
        • NNGTS Operational Gas Injection
        • Operational Gas Unit Charge
        • Operational Gas Offsetting Cost
      • Annex I of Regulation 715/2009
      • Commission Regulation (EU) 2017/460
    • LNG Services
      • LNG Access Guide
      • LNG Users Information
        • LNG Re – gasification Capacity
        • LNG Cargoes Unloading Program
        • Additional LNG Storage Space
        • Historical Data of LNG Operation
        • Total LNG Stock
        • LNG Quality Specifications
        • LNG Facilities Maintenance Program
        • Annual LNG Auctions
      • Standard Agreement & Other Documents
      • LNG Tariffs
        • Calculator of LNG Charges
        • Guarantees Calculator
      • LNG Terminal Operational Needs / LNG Facility Losses (2010-2020)
      • LNG Terminal Technical Data
      • LNG Terminal Offsetting Account Cost
      • LNG Transparency Template
    • Truck Loading Service
      • Regulatory framework
      • Framework Agreement
      • TLS Tariffs
      • TLS Timeslots
      • Technical Data for LNG Truck Loading Facility Usage
    • Balancing Services
      • Annual Planning of Gas Balancing
      • Balancing Costs
      • Unaccounted For Gas(UFG)
      • Daily Inbalance Settlement Prices
    • Access to EIS
    • Transparency
      • REMIT Reporting
      • UMM
        • Active Messages
        • Archive
  • OTHER SERVICES
    • Supplementary Transmission Services
    • Network Operation & Maintenance
    • Technical Support
    • Metrology
    • Pipeline Protection
    • LNG
    • CNG
    • Odorization
    • Welder Certification
    • Carbon Footprint
    • EU ETS Management
    • Seminars
    • Our Clients
    • Our e-brochure
  • SAFETY / ENVIRONMENT / QUALITY
    • Safety
      • Campaigns
      • Trainings - Collaborations
    • Environment
      • Carbon Footprint
    • Quality
  • ANNOUNCEMENTS
    • NNGS Users Information
    • Public Consultations
    • Procurement Procedures
  • THE COMPANY
    • Our Vision
    • Ιστορικό
    • Shareholders
    • Subsidiaries
    • Company Organization / Organizational Structure
      • Managing Team
    • Legislative Framework of Tendering Procedures
    • Financial Reports
    • Membership in International Institutions
  • CORPORATE SOCIAL RESPONSIBILITY
    • Sustainability Policy
  • PRESS CENTER
    • Press Releases
    • Corporate Brochures
    • Building Up the Greek Hydrogen Value Chain
  • CONTACT
  • ΗΛΕΚΤΡΟΝΙΚΗ ΦΟΡΜΑ ΥΠΟΒΟΛΗΣ ΓΝΩΣΤΟΠΟΙΗΣΗΣ
REGULATORY SERVICES
  • ΗΟΜΕ
  • REGULATED SERVICES
  • TRANSPARENCY
  • UMM
  • ACTIVE MESSAGES
A-AA+
  • Transmission Services
  • LNG Services
  • Truck Loading Service
  • Balancing Services
  • Access to EIS
  • Transparency
    • REMIT Reporting
    • UMM
      • Active Messages
      • Archive

Active Messages

  •  
    • UMM Gas 13/10/2020-15/10/2020 Sidirokastro Entry

      Message ID20092421X-GR-A-A0A0A-G009_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-13T06:00:00+02:00
      Event stop2020-10-16T06:00:00+02:00
      Event statusActive
      Reason of unavailability1) Disconnection of old and installation of new Regulating Valves Mokveld at Bordering Metering Station (BMS) Sidirokastro2) Connection to the NNGTS of the Metering/Regulating Station (U6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 19.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 36.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity117804036.00
      Available capacity19000000.00
      Unavailable capacity98804036.00
      Publication date and time2020-09-24T14:22:43+02:00
    • UMM Gas 13/10/2020-15/10/2020 Sidirokastro Exit

      Message ID20092421X-GR-A-A0A0A-G010_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-13T06:00:00+02:00
      Event stop2020-10-16T06:00:00+02:00
      Event statusActive
      Reason of unavailability1) Disconnection of old and installation of new Regulating Valves Mokveld at Bordering Metering Station (BMS) Sidirokastro2) Connection to the NNGTS of the Metering/Regulating Station (U6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 19.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 36.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionexit
      Unit of measurementkWh/d
      Technical capacity64826100.00
      Available capacity0.00
      Unavailable capacity64826100.00
      Publication date and time2020-09-24T14:22:43+02:00
    • UMM Gas 13/10/2020-15/10/2020 Kipi Entry

      Message ID20092421X-GR-A-A0A0A-G011_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-13T06:00:00+02:00
      Event stop2020-10-16T06:00:00+02:00
      Event statusActive
      Reason of unavailability1) Disconnection of old and installation of new Regulating Valves Mokveld at Bordering Metering Station (BMS) Sidirokastro2) Connection to the NNGTS of the Metering/Regulating Station (U6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 19.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 36.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000233W
      Affected asset or unit (EIC)21Z000000000233W
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity48592292.00
      Available capacity36000000.00
      Unavailable capacity12592292.00
      Publication date and time2020-09-24T14:22:43+02:00
    • UMM Gas 16/10/2020-20/10/2020 Sidirokastro Entry

      Message ID20092421X-GR-A-A0A0A-G012_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-16T06:00:00+02:00
      Event stop2020-10-21T06:00:00+02:00
      Event statusActive
      Reason of unavailability1) Disconnection of old and installation of new Regulating Valves Mokveld at Bordering Metering Station (BMS) Sidirokastro2) Connection to the NNGTS of the Metering/Regulating Station (U6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 40.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 15.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity117804036.00
      Available capacity40000000.00
      Unavailable capacity77804036.00
      Publication date and time2020-09-24T14:25:45+02:00
    • UMM Gas 16/10/2020-20/10/2020 Sidirokastro Exit

      Message ID20092421X-GR-A-A0A0A-G013_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-16T06:00:00+02:00
      Event stop2020-10-21T06:00:00+02:00
      Event statusActive
      Reason of unavailability1) Disconnection of old and installation of new Regulating Valves Mokveld at Bordering Metering Station (BMS) Sidirokastro2) Connection to the NNGTS of the Metering/Regulating Station (U6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 40.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 15.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionexit
      Unit of measurementkWh/d
      Technical capacity64826100.00
      Available capacity0.00
      Unavailable capacity64826100.00
      Publication date and time2020-09-24T14:25:45+02:00
    • UMM Gas 16/10/2020-20/10/2020 Kipi Entry

      Message ID20092421X-GR-A-A0A0A-G014_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-16T06:00:00+02:00
      Event stop2020-10-21T06:00:00+02:00
      Event statusActive
      Reason of unavailability1) Disconnection of old and installation of new Regulating Valves Mokveld at Bordering Metering Station (BMS) Sidirokastro2) Connection to the NNGTS of the Metering/Regulating Station (U6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 40.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 15.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000233W
      Affected asset or unit (EIC)21Z000000000233W
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity48592292.00
      Available capacity15000000.00
      Unavailable capacity33592292.00
      Publication date and time2020-09-24T14:25:45+02:00
    • UMM Gas 27/10/2020-29/10/2020 Sidirokastro Entry

      Message ID20092421X-GR-A-A0A0A-G015_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-27T05:00:00+01:00
      Event stop2020-10-30T05:00:00+01:00
      Event statusActive
      Reason of unavailabilityConnection to the NNGTS of the Metering/Regulating Station (U-6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 19.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 36.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity117804036.00
      Available capacity19000000.00
      Unavailable capacity98804036.00
      Publication date and time2020-09-24T14:29:02+02:00
    • UMM Gas 27/10/2020-29/10/2020 Sidirokastro Exit

      Message ID20092421X-GR-A-A0A0A-G016_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-27T05:00:00+01:00
      Event stop2020-10-30T05:00:00+01:00
      Event statusActive
      Reason of unavailabilityConnection to the NNGTS of the Metering/Regulating Station (U-6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 19.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 36.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionexit
      Unit of measurementkWh/d
      Technical capacity64826100.00
      Available capacity0.00
      Unavailable capacity64826100.00
      Publication date and time2020-09-24T14:29:02+02:00
    • UMM Gas 27/10/2020-29/10/2020 Kipi Entry

      Message ID20092421X-GR-A-A0A0A-G017_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-27T05:00:00+01:00
      Event stop2020-10-30T05:00:00+01:00
      Event statusActive
      Reason of unavailabilityConnection to the NNGTS of the Metering/Regulating Station (U-6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 19.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 36.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000233W
      Affected asset or unit (EIC)21Z000000000233W
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity48592292.00
      Available capacity36000000.00
      Unavailable capacity12592292.00
      Publication date and time2020-09-24T14:29:02+02:00
    • UMM Gas 30/10/2020 Sidirokastro Entry

      Message ID20092421X-GR-A-A0A0A-G018_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-30T05:00:00+01:00
      Event stop2020-10-31T05:00:00+01:00
      Event statusActive
      Reason of unavailabilityConnection to the NNGTS of the Metering/Regulating Station (U-6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 40.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 15.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity117804036.00
      Available capacity40000000.00
      Unavailable capacity77804036.00
      Publication date and time2020-09-24T14:30:07+02:00
    • UMM Gas 30/10/2020 Sidirokastro Exit

      Message ID20092421X-GR-A-A0A0A-G019_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-30T05:00:00+01:00
      Event stop2020-10-31T05:00:00+01:00
      Event statusActive
      Reason of unavailabilityConnection to the NNGTS of the Metering/Regulating Station (U-6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 40.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 15.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000020C
      Affected asset or unit (EIC)21Z000000000020C
      Point directionexit
      Unit of measurementkWh/d
      Technical capacity64826100.00
      Available capacity0.00
      Unavailable capacity64826100.00
      Publication date and time2020-09-24T14:30:07+02:00
    • UMM Gas 30/10/2020 Kipi Entry

      Message ID20092421X-GR-A-A0A0A-G020_001
      Is latest versionYes
      TSO nameHellenic Gas Transmission System Operator S.A.
      TSO EIC21X-GR-A-A0A0A-G
      Balancing zoneGreece
      Event start2020-10-30T05:00:00+01:00
      Event stop2020-10-31T05:00:00+01:00
      Event statusActive
      Reason of unavailabilityConnection to the NNGTS of the Metering/Regulating Station (U-6910) at the Interconnection Point between the DESFA and TAP networks at Nea Messimvria
      Type of eventTransmission system unavailability
      Type of unavailabilityPlanned
      RemarkTransmission Capacity for Delivery at Entry Point 'SIDIROKASTRO': 40.000.000 kWh/Day Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/DayTransmission Capacity for Delivery at Entry Point 'KIPI': 15.000.000 kWh/Day
      Affected asset or unit (Point name)21Z000000000233W
      Affected asset or unit (EIC)21Z000000000233W
      Point directionentry
      Unit of measurementkWh/d
      Technical capacity48592292.00
      Available capacity15000000.00
      Unavailable capacity33592292.00
      Publication date and time2020-09-24T14:30:07+02:00
Hellenic Gas Transmission System Operator S.A.
Site Map
  • NATIONAL NATURAL GAS SYSTEM
    • REGULATORY FRAMEWORK / COMPLIANCE
      • PROJECTS
        • REGULATED SERVICES
          • OTHER SERVICES
            • SAFETY / ENVIRONMENT / QUALITY
              • ANNOUNCEMENTS

                ACCESS
                • Electronic Informatin System ESFA and Online Trading System N.G.
                Contact
                • DESFA Head Office
                • 357 -359 Mesogeion Av.
                • 152 31 Chalandri
                • Tel: +30 213 0884000
                • Fax: +30 210 6749504
                • Email: desfa@desfa.gr
                Εmergency Call
                Εmergency Call
                8001122222 (+30) 2105551666
                Links
                • Ministry Of Environment & Energy
                • RAE (Regulating Authority for Energy) in Greece
                • EDA Attica
                • EDATHESS Gas Distribution Company Thessaloniki - Thessalia SA
                • DEDA
                • ADMIE
                • LAGIE
                • ENTSOG
                • Gas Naturally
                • GIE
                • IGU
                Social Media

                © copyright DESFA 2018

                Top