Emergency Call
.

Αccording to the provisions of article 92 of the NNGS Network Code establishes and set in public consultation the Draft Development Plan for the years 2024-2033 in Greek and English language. For the establishment of the Draft Development Plan, the TSO takes into consideration the outcomes of the NNGS Development Study as well as:

Elements of the current and the estimated supply and demand of natural gas.

  • The fulfillment of public service obligations and the assurance of natural gas supply in a credible and cost-effective way.
  • The improvement of the NNGS efficiency and the ensuring of its orderly operation aiming at the prevention of congestions, emergencies and refusal of access.
  • The supply of new areas with natural gas and the ensuring of new Users’ potential access.
  • The protection of the environment.
  • The Union wide development plan in accordance with the provisions of Article 32 as well as point (b) of paragraph 3 of Article 26 and paragraph 1 of Article 31 of Regulation (EU) 2024/1789 
  • The sustainability of the works included in the Plan and their potential financing outside the framework of the Development Plan.

Regulatory Authority for Waste , Energy & Water approved with decision Ε-53 /2025 (Gov. Gazette  B’ 4622/27.08.2025) the Development Plan for 2024-2033.

List of Small Projects

Αccording to art. 95 of NNGS Network Code, as valid, DESFA publishes a List of Small Projects.

The List of Small Projects includes:

  • Small Projects which have been included in Development Plan 2024-2033
  • Small Projects which have not been included in Development Plan 2024-2033 and comply with the requirements of art. 94 par. 5 of NNGS Code

Southern Corridor Gas Regional Investment Plan (GRIP)