Emergency Call
.

Our News

LNG FSU Shipping Requirement

18 Apr 2022

More

READ MORE

INTERNATIONAL OPEN TENDER DESFA Nο. 962/22

18 Apr 2022

DETAILED ENGINEERING, PROCUREMENT AND CONSTRUCTION OF THE CONNECTION OF ELPEDISON POWER PLANT TO THE NNGTS

READ MORE

OPEN TENDER DESFA No 965/22 – BID DUE DATE EXTENSION

15 Apr 2022

MAINTENANCE OF NATURAL GAS TRANSMISSION SYSTEM OF THE TAP AG AND ITS FACILITIES LOCATED IN GREEK TERRITORY

READ MORE

INTERNATIONAL OPEN TENDER DESFA Nο. 960/22

15 Apr 2022

DETAILED ENGINEERING, PROCUREMENT AND CONSTRUCTION OF THE CONNECTION WITH THE FSRU OF ALEXANDROUPOLIS

READ MORE

DESFA and ELINOIL intend to cooperate in the field of hydrogen

14 Apr 2022

DESFA and ELINOIL announced their intention to proceed with a Memorandum of Understanding (MoU) in the framework of the Important Project of Common European Interest for “Hydrogen” (IPCEI Hydrogen). In particular, the two companies will explore the possibilities of their cooperation in the project, as well as other relevant initiatives in the...

READ MORE

DESFA’s Results on Natural Gas Consumption in the first quarter of 2022

12 Apr 2022

6.18% increase in natural gas consumption in Greece in the first quarter of 2022 compared to the same period of 2021 Revithoussa LNG Terminal (Agia Triada entry point) has been the main gas entry gateway of Greece in the first quarter of 2022, covering 43.23% of imports. The contribution of the interconnection point with TAP (Nea Messimvria entry point) was also increased...

READ MORE

EU Commissioner for Energy Kadri Simson visits the LNG Terminal of Revithoussa

7 Apr 2022

The European Commissioner for Energy, Kadri Simson, visited DESFA’s LNG Terminal of Revithoussa on Thursday, April 7th 2022, as part of her three-day visit to Greece. The Commissioner was accompanied by the Greek Minister of Environment and Energy, Kostas Skrekas, the Secretary General of Energy and Mineral Resources, Alexandra Sdoukou, as well as...

READ MORE

Announcement of the Initial LNG Cargoes Unloading Monthly Plan for the Month May 2022

7 Apr 2022

Initial LNG Cargoes Unloading Monthly Plan for the Month May 2022

READ MORE

Open online Workshop on 13 April for the LNG Truck Loading Station in the Revithoussa LNG Terminal

4 Apr 2022

Entering the final stretch for the completion of the construction of the pilot LNG Truck Loading Station in the Revithoussa LNG Terminal Station, DESFA organizes an open online workshop, on Wednesday, April 13, 2022, at 12.00, for the information about the new service and the relevant specifications. The LNG Truck Loading Station is the first such...

READ MORE

INTERNATIONAL OPEN TENDER DESFA Nο. 964/22

4 Apr 2022

CONSTRUCTION SUPERVISION AND ENGINEERING SERVICES FOR “HIGH PRESSURE PIPELINE TO WEST MACEDONIA” PROJECT

READ MORE