HomeIncrease of the Technical Capacity of the Entry Point “AGIA TRIADA” and the LNG Regasification Capacity
Increase of the Technical Capacity of the Entry Point “AGIA TRIADA” and the LNG Regasification Capacity
Posted on May 13, 2022
DESFA announces the increase of the Technical Capacity of the Entry Point “AGIA TRIADA” and the LNG Regasification as of 01.06.2022 to 224.592.985 kWh/Day.