Emergency Call
.

LNG Re-Gasification Capacity

The Technical Re-gasification Capacity (Sustained Maximum Send Out Rate), taking into account the Capacity of the Metering Station Agia Triada, equals to 19.373.155 Nm3/D or 224.592.985 KWh/D (assuming that 1.000 Nm3 = 11,593 MWh Gross Calorific Value (G.C.V.))

The minimum technical Re-gasification capacity or the Minimum Daily Send Out Rate of LNG Terminal is defined at 19.200.000 kWh/D, taking into account the minimum technical capacity of equipment.

Available LNG Re-gasification Capacity – 24 Months