DESFA announces the increase of firm capacity at the IP Kulata (BG) – Sidirokastron (EL), in the direction from Greece to Bulgaria, to the level of 64,695,000 kWh/Day, as of 01.01.2020.
DESFA announces the increase of firm capacity at the IP Kulata (BG) – Sidirokastron (EL), in the direction from Greece to Bulgaria, to the level of 64,695,000 kWh/Day, as of 01.01.2020.